About Raised Floor Solutions
Raised Floor Solutions is a specialist composite flooring contractor established in 2003 in Skelmersdale in Lancashire. The company became Employee Owned in 2019 and is a proud member of the EOT (Employee Ownership Trust).
RFS is the UK’s largest approved supplier and installer of Kingspan Multideck Steel Decking products and is a Tier 1 installer of Kingspan Access Floors.
Fiver specialist trading divisions – Metaldeck Steel Decking contractors, Metpark Car Park Design and Build, Metcon Concrete Flooring Contractors, Metalroof Contractors and Access Flooring – provide clients all over the UK with a total packaged solution to the design and construction of composite concrete floor systems, metal roof systems, new build car park schemes and raised access flooring installations.
All site operatives are directly employed, trained and fully accredited to the current industry requirements.
Raised Floor Solutions offers a full in-house design service to achieve the most economic and specification compliant flooring solution. Designs are underpinned by the latest Kingspan technical software and product guarantees. RFS can provide collateral warranties backed with up to £5 million professional indemnity insurance.
Partnerships with Steel Contractors and Main Contractors
Raised Floor Solutions works in partnership with Clients, which include main contractors and steel contractors, to realise end user requirements. The RFS technical team can advise on the most viable solutions and can supply CAD drawings and collaborate on BIM (Building Information Modelling) to an ISO 9001 Quality Management Standard.
Meet the Team

Sharon Hollins, Group
Commercial Manager

David Chester, Design &
Technical Manager
David has been with the business since the beginning, joining the team in the drawing office and progressing to Design & Technical Manager. He now sees leads all pre site design activities together with the on site delivery of deck and concrete to the agreed design and specification.

Jamie Richards,
Contracts Manager
Access Flooring
Jamie joined RFS in 2019 and works with the Access Flooring team to prepare detailed project tenders for new and existing clients. He represents the division at Client meetings and leads the team to ensure every contract is delivered to our highest standards.

As part of the management team since 2006 Sarah has progressed to Operations Manager within the Metaldeck and Concrete division. As well as her responsibility for the day to day organisation of decking and concrete projects Sarah maintains the Companies ISO Quality and CE Marking standards ensuring our continuing compliance.

Kevin joined Metaldeck in 2004 as a steel decking Estimator progressing to Sales & Estimating Manager in 2015. With years of knowledge and experience of composite steel deck and concrete floor systems Kevin and his team of Estimators provide our clients with competitive tender prices which in most cases offer value engineered solutions.

Anthony Richardson,
Non-Exec Director & Chief Financial Officer

Richard Rowles,
Drawing Office & BIM Manager
Richard joined Metaldeck as a trainee draughtsman in 2006 using AutoCAD to produce deck design and layout drawings. He is now the Drawing Office & BIM Manager and leads the drawing team to produce detailed projects drawings using Autodesk Revit 3D which can then be integrated into state-of-the-art BIM models.

Richard Smith,
Senior Contracts Manager

Metpark specialises in the design and installation of composite steel floor decking for use in multi-storey car parks

Metcon Concrete Floors designs, supplies and installs concrete flooring on all types of steel decking floor systems

Access Flooring designs, supplies and installs raised access floor systems and is an approved Tier 1 Kingspan Contractor


Design
Raised Floor Solutions offers a full in-house design service. Early project involvement allows the company to value engineer the steel deck, concrete floor slab and access flooring elements to establish the most efficient design solution.
All design work is assured by the latest Kingspan design software and professional indemnity insurance.
Download a Company Brochure
Contact us 
Raised Floor Solutions Ltd
3B, Maple Court
White Moss Business Park
Skelmersdale
WN8 9TW
Tel: 01695 555003 or 01695 555070
Email: enquiries@raisedfloor.co.uk
Email: enquiries@metaldeck.uk.com
RFSGroup
Latest news 
Successful opening of Stockport Exchange Multi-Storey Car Park
Raised Floor Solutions (RFS) is pleased to announce the successful opening of the new multi-storey car park at Stockport Exchange. RFS’s Metal Decking and Metcon department secured the car
Highlight Schemes Q2 – Metal deck, Metcon & Access Flooring
As we begin the second half of 2023, we reflect on our accomplishments during the previous quarter across all sectors of our business including Metal decking, Metcon, Metpark and Access
Accreditations






