Category: Hoesch Additive Flooring

22May

RFS Win Contract For Liverpool Multi-Storey Car Park

Raised Floor Solutions has been awarded the contract to supply and install steel floor deck and concrete flooring in a new 333 space multi-storey car park on Victoria Street in Liverpool. Funded by Liverpool City Council, the new £6.5m five-storey car park replaces an existing surface car park, which offered half the number of spaces
  • Posted by Jackie  Posted on 22 May  0 Comments
  • Read More
31August

Hoesch Additive Flooring from Metaldeck

Hoesch Additive Flooring, the long spanning steel floor deck developed for use in car park construction, can be supplied and installed by steel decking contractors Metaldeck. Following its acquisition of ThryssenKrupp Construction, original manufacturers of Hoesch Additive Flooring, Kingspan has launched a new brochure to highlight the benefits of the long spanning steel floor deck. Hoesch Additive Flooring can be
  • Posted by admin  Posted on 31 Aug  0 Comments
  • Read More
26September

Positive Start to Year for RFS

Raised Floor Solutions is reporting a positive start to 2013 after securing an increasing volume of composite floor packages in addition to achieving  ‘approved supplier’ status in the UK for Kingspan’s new Hoesch Additive Floor range. Hoesch Additive Floor (also known as Kingspan Multideck 206C) is a long spanning steel floor deck primarily designed for
  • Posted by admin  Posted on 26 Sep  0 Comments
  • Read More