Category: Metcon

15August

Triple Contract Win for RFS on Blackpool’s First Five Star Hotel

Raised Floor Solutions has secured the contract to provide steel deck, concrete floors and steel structural roof deck for the construction of Blackpool’s first five-star hotel and a museum dedicated to the famous seaside resort’s rich history. The £20m Sands Venue Resort Hotel is being constructed on the site of the former Palatine Hotel on
  • Posted by Jackie  Posted on 15 Aug  0 Comments
  • Read More
05June

£19M ELEVEN-STOREY STUDENT BUILDING GETS UNDERWAY

An eleven-storey building providing 404 student bedrooms in Liverpool is the latest contract win for the steel decking and concrete flooring teams at Raised Floor Solutions. The new building will be connected by gardens to a twelve-storey Marriott Moxy hotel, part of the same £19m development under construction for NR Capricornus, a division of Niveda
  • Posted by Jackie  Posted on 05 Jun  0 Comments
  • Read More
28May

CONTRACT SECURED FOR £75M BUILD-TO-RENT SCHEME

The contract to supply and install 31,000m2 of steel decking and concrete flooring for the construction of six buildings housing 363 apartments in Manchester has been awarded to Raised Floor Solutions. Located on Chester Road in the Cornbrook area of the city, the landmark £75M build-to-rent scheme, for developer Brickland, was designed by acclaimed Manchester
  • Posted by Jackie  Posted on 28 May  0 Comments
  • Read More
14May

Composite Flooring for Apartments Delivered

Raised Floor Solutions has delivered steel floor decking and concrete floors for the construction of a residential apartment block on the site of the former Swallowfield Hotel in Horwich, near Bolton. The Hotel was demolished in 2008 to make way for a Redrow residential scheme, however the project was stalled due to the financial recession.
  • Posted by Jackie  Posted on 14 May  0 Comments
  • Read More
09May

Contract Secured for Windermere Marina Village

Raised Floor Solutions has secured the contract to provide steel floor decking and concrete floors for the construction of three luxury apartment blocks within a £10M redevelopment of Windermere Marina Village. The popular staycation spot, which is located in Bowness within the Lake District National Park, was affected by flooding in December 2009 and 2015,
  • Posted by Jackie  Posted on 09 May  0 Comments
  • Read More
02May

DECK & CONCRETE DELIVERED IN BALTIC TRIANGLE

Continuing it’s steady stream of work in Liverpool, Raised Floor Solutions has delivered a steel floor deck and concrete flooring package for the construction of a build-to-rent apartment block on Tabley Street in Liverpool’s desirable Baltic Triangle. Called ‘Baltic Art’ and located just 500m from the city centre, the apartment scheme offers 55 one and
  • Posted by Jackie  Posted on 02 May  0 Comments
  • Read More
29January

DECK & CONCRETE CONTRACT FOR BRIGHOUSE EXTRA CARE HOMES

The steel decking and concrete flooring contract for an £11.3 million new development of affordable apartments aimed at the over-55s and those with dementia has been secured by Raised Floor Solutions. The development is a collaboration between Home Group, Calderdale Council, architects Brewster Bye and energy and regeneration specialist ENGIE. Sixty-five apartments are under construction
  • Posted by Jackie  Posted on 29 Jan  0 Comments
  • Read More
01June

CONTRACT WIN ON £100M ‘AURA’ PROJECT

Raised Floor Solutions has been awarded the contract to provide steel decking and concrete flooring for the construction of a significant new £100m mixed use development adjacent to Liverpool’s ‘Knowledge Quarter’. ‘Aura’ is a landmark new development, which is being built on the site of the former Erskine Industrial Estate and lies in a strategic
  • Posted by Jackie  Posted on 01 Jun  0 Comments
  • Read More
14February

RFS LANDS NQ RESIDENTIAL CONTRACT

Raised Floor Solutions has been awarded the contract to provide steel decking and concrete floors for a major new residential apartment building in the heart of Manchester’s creative district. Located on Tib Street, opposite Manchester shopping landmark ‘Afflecks Palace’, Citu NQ (also marketed as SYNQ) will offer 183 apartments over eight storeys including a rooftop
  • Posted by Jackie  Posted on 14 Feb  0 Comments
  • Read More
06February

DECK AND CONCRETE CONTRACT FOR MIXED USE STUDENT SCHEME

Raised Floor Solutions has secured the contract to supply steel decking and concrete flooring for the construction of a new mixed use scheme in the heart of Manchester’s prime student district. The new development will adopt the name of the public house that previously occupied the site, ‘The Orange Grove’, and will offer 35 one,
  • Posted by Jackie  Posted on 06 Feb  0 Comments
  • Read More