25November

Metaldeck Win Steel Decking for Sixth Form Centre

Steel decking specialist Metaldeck has been contracted by J Greenwood Builders Ltd to design, supply and install steel floor decking in a new sixth form centre at Manchester High School for Girls.

Work on the new state of the art building at Manchester High School for Girls, is currently underway and is anticipated to be completed by September 2014.

The new facilities will include a lecture theatre, an ICT suite, additional lesson rooms and science laboratories as well as a new café area and common room.

A total of 800m2 of MD60 composite steel decking will be designed and installed by Metaldeck.

Posted by admin  Posted on 25 Nov 
  • education, manchester, school, steel decking