Raised Floor

Email: enquiries@raisedfloor.co.uk Tel: 01695 555070
  You are here / Home / News
cgi of tameside hospital featuring a three storey building the ground floor has a glazed front facade and the floors above are set further back and constructed from red brick. RFS will install metal roof decking for the entrance at the front of the building.

Metal roof for Tameside AE

Raised Floor Solutions has delivered the metal roof decking contract for a new extension to Tameside General Hospital’s Accident & Emergency department. This is the second contract on this project

Read More
steel flooring

Steel Flooring for Gateshead School

The steel flooring contract for a new three-storey development at a primary school in Gateshead has been secured by Raised Floor Solutions. The contract includes the installation of reinforced concrete

Read More
Front facade of a 7 storey office building with brown/grey brick and white window surrounds. To the right is a red brick wall with black wrought iron gates and ornate urns sat atop each gate pillar. RFS is installing metal floor decking for the redevelopment of the building.

Metal Floor Decking for London Offices

Raised Floor Solutions has started on site in London, installing metal floor decking for the £22million redevelopment of a prestigious office building at Manchester Square. The seven-storey Marylebone based building

Read More