30May

RFS completes at Luneside

Raised Floor Solutions has completed a contract in Lancaster delivering steel floor decking for the construction of a new 419-bed student village on the banks of the River Lune.

Called ‘Luneside’, the development comprises three buildings of three, five and six-storeys with new pedestrian and cycle links into the city, open space and car parking.

The buildings occupy the site of a former mill which had become derelict following a major fire in 2012 and was demolished as part of the works.

The contract was delivered by Metaldeck Steel Decking, with teams on site to supply and install 13,000m2 of Kingspan MD60 Multideck steel decking. 

Raised Floor Solutions is the leading approved supplier and installer of Kingspan Multideck products with a 10% share of the composite UK floor decking market. In 2018, the business turned over £16million and supplied and installed 425,000m2 of composite floors on 250 UK based projects.

Posted by Jackie  Posted on 30 May 
  • Metaldeck, residential, steel floor decking